Although most of the responsibility of a PPS lays in the candidates generation and classification modules, other additional components are needed to fulfill the system requirements and complete the process. They are the preprocessing module, which is placed at the beginning of the system’s pipeline before the candidates generation; the verification and refinement, which are placed just after the classification; and the tracking and application modules, which are placed at the end of the system’s pipeline and it is the one that generates the output. In addition to reviewing such modules, in this chapter we also review the approaches employed to achieve real-time, which is a global aspect to take into account in a real system.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Completing the System


    Weitere Titelangaben:

    SpringerBriefs Computer Sci.


    Beteiligte:


    Erscheinungsdatum :

    01.09.2013


    Format / Umfang :

    13 pages





    Medientyp :

    Aufsatz/Kapitel (Buch)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Completing the fleet

    Tema Archiv | 1984


    COMPLETING UNDERWATER WELLS

    HAILEY TRAVIS THOMAS JR / HARRELL THURMAN PHILIP | Europäisches Patentamt | 2019

    Freier Zugriff

    Completing the fleet

    Kraftfahrwesen | 1984


    Completing the Set

    British Library Online Contents | 2017


    Completing the family

    Engineering Index Backfile | 1930