Abstract This paper proposes a new optimization method for the operation of the Constantine tramway. The method is based on data of operation recorded in the line since June 2013. The objective of this work is to analyze the current operation of Constantine line and its performance, in order to improve both the attractiveness of the line, through competitive offers, regularity, commercial speed and capacity, and its economic viability, through a redistribution of resources and a better matching of its offer to its demand. This work reports on the first optimization of Algerian tramway operation.
Contribution to the Optimization of the Operation of an Urban Railway Line. Case Study: Constantine Tramway
01.01.2018
5 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
EVALUATION OF SOCIO-ECONOMIС VARIABLES FOR THE CONSTANTINE TRAMWAY LINE
DOAJ | 2022
|Le tramway de Constantine à nouveau à l’arrêt
IuD Bahn | 2011
|Premières lignes de tramway à Oran et Constantine
IuD Bahn | 2013
|Engineering Index Backfile | 1903
|Interconnecting tramway and railway system
IuD Bahn | 2011
|