Managing a construction project is challenging because of cost, time, safety, and quality considerations. In the most projects, the cost of construction is one of the most critical aspect because material cost alone accounts for significant ratio of the total project. Therefore, the cost of construction materials should be controlled. In this study, we proposed the use of material requirements planning (MRP) to control the cost of construction materials. After determining the demand for the materials required for construction, we estimated both the quantity of materials required and time taken to deliver the materials to the construction site. Although economic order quantity models have been applied to analyze construction material costs, they do not accurately reflect concerns related to material cost. Therefore, we used the material supply chain model (construction logistics planning) to analyze material costs. To optimize MRP according to the current progress of a project, a novel approach combining the dragonfly algorithm (DA) and particle swarm optimization algorithm (PSO) was proposed. To verify the advanced searchability of the DA–PSO algorithm, the algorithm was compared with the gray wolf and the genetic algorithms.
Optimization of Construction Material Cost through Logistics Planning Model of Dragonfly Algorithm — Particle Swarm Optimization
KSCE J Civ Eng
KSCE Journal of Civil Engineering ; 25 , 7 ; 2350-2359
01.07.2021
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Particle Swarm Optimization Algorithm
British Library Online Contents | 2005
|Particle Swarm Optimization Algorithm for Drilling Path Planning Problem
British Library Online Contents | 2008
|Compact Particle Swarm Optimization Algorithm
British Library Online Contents | 2006
|Optimizing Robot Path Planning with the Particle Swarm Optimization Algorithm
BASE | 2023
|