Abstract We consider the problem of coordinating the operations of two supply chain partners: a foreign shipping company and a domestic port. The two partners have conflicting business objectives, and the issue is to determine the optimal cycle time, by which the shipping company removes the empty containers from the domestic port, so that the joint profit of the two partners is maximized. The domestic port prefers a shorter cycle time to mitigate its empty container accumulation and land use problems, while the shipping company wishes a longer cycle time to save its expensive vessel capacities. We propose an iterative procedure to search for this optimal cycle time. In each iteration, a candidate cycle time is evaluated by solving a deterministic vessel scheduling problem and a stochastic container-yard capacity optimization problem. We prove the properties of the vessel scheduling problem, derive the optimality condition under which the vessel scheduling problem can be decomposed, and show that the profit function of the domestic port is convex and thus the optimal container-yard capacity can be determined efficiently. Empirical observations on the algorithm computational performance collected from over 300 randomly generated test cases under various problem settings are reported.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Scheduling vessels and container-yard operations with conflicting objectives


    Beteiligte:
    Boros, Endre (Autor:in) / Lei, Lei (Autor:in) / Zhao, Yao (Autor:in) / Zhong, Hua (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    17.11.2007


    Format / Umfang :

    22 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch





    Scheduling Twin Yard Cranes in a Container Block

    Gharehgozli, Amir Hossein | Online Contents | 2014


    CONTAINER YARD AND CONTROL METHOD FOR CONTAINER YARD

    KAYASUGA NOBUYA | Europäisches Patentamt | 2017

    Freier Zugriff

    Robust Multistage Yard Crane Scheduling in Container Terminals

    Marx, Tobias / Hartisch, Michael | Springer Verlag | 2022


    Time-Window Based Berth and Yard Allocation Planning of Container Vessels

    Xu, Jialin / Wang, Sujing / Xu, Qiang | ASCE | 2019