Abstract In recent years, Vietnam has many diseases such as measles, HFMD, chicken pox, and so on. Although there are many new hospital projects, the central hospitals of government still usually overload. Besides that, similar to other construction projects, the hospital projects in Vietnam always have lengthy delays. This research analyzed the factors that cause delay the time of hospital projects in Vietnam, a type of specialized industrial construction projects. Factor analysis and survey expert were used in this case. The concept of correlation was also applied. The result of this survey shows that the main reason groups of the delay for hospital projects: ability of owner and contractor, ability of consultant and contractor, outside effects, ability of designers, ability of supervisors and other causes. With these groups, thirty-three factors have found and ranked. This result can be used for checking the policy for hospital project management; and will help the practitioners achieve successful hospital projects.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Delay factor analysis for hospital projects in Vietnam


    Beteiligte:
    Kim, Soo-Yong (Autor:in) / Tuan, Kiet Nguyen (Autor:in) / Luu, Van Truong (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2015-04-20


    Format / Umfang :

    11 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Delay factor analysis for hospital projects in Vietnam

    Kim, Soo-Yong / Tuan, Kiet Nguyen / Luu, Van Truong | Online Contents | 2016


    Cost overrun factor analysis for hospital projects in Vietnam

    Kim, Soo-Yong / Tuan, Kiet Nguyen / Lee, Jae Do et al. | Online Contents | 2018


    Cost overrun factor analysis for hospital projects in Vietnam

    Kim, Soo-Yong / Tuan, Kiet Nguyen / Lee, Jae Do et al. | Springer Verlag | 2017


    Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries

    Le-Hoai, Long / Lee, Young Dai / Lee, Jun Yong | Springer Verlag | 2008


    Estimating time performance for building construction projects in Vietnam

    Le-Hoai, Long / Lee, Young Dai / Nguyen, Anh Tuan | Online Contents | 2013