Abstract Tunnels excavated through weak rock masses using the Shallow Tunneling Method (STM) call for rigid lining support to withstand and constrain the mobility of the unstable rock where its performance needs to be assessed with field measured data in case of potential failure. For fear of any further hazards after the occurrence of a rock fall at chainage km 86,685 m in the Longsheng Tunnels, the monitoring plan was specially modified to accurately obtain the relative vertical and horizontal displacements of the steel rib component in the arch-shaped composite rigid primary lining that was simply placed on the heading. In this paper, the weak rock masses’ interaction with the rigid lining is treated as unknown distributed loads divided into radial and tangential directions, where the influence line theory is applied to better understand the response of the lining so as to facilitate a displacement-based back analysis for unknown rock mass loads and the resultant stress outcome. By comparing the back analyzed stress outcome with the measured one, the proposed performance assessing method for the unclosed arch-shaped lining was proven to be time efficient with acceptable accuracy, which is of considerable application potential and can provide a reference for similar engineering.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Performance Assessment of Arch-shaped Primary Lining during Construction in Weak Rock Shallow-buried Tunnel


    Beteiligte:
    Liu, Yingqi (Autor:in) / Zhang, Xiedong (Autor:in) / Li, Jiali (Autor:in) / Zhang, Zhihua (Autor:in) / Zhang, Hang (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2018-11-30


    Format / Umfang :

    11 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Performance Assessment of Arch-shaped Primary Lining during Construction in Weak Rock Shallow-buried Tunnel

    Liu, Yingqi / Zhang, Xiedong / Li, Jiali et al. | Online Contents | 2019


    Tunnel inverted arch lining trolley

    FENG JIA / WANG YUYAN / HUANG JIN | Europäisches Patentamt | 2021

    Freier Zugriff

    Calculation of Pressure on the Shallow-buried Double-arch Tunnel Without Middle Drift

    Tang, Hua / Jiang, Chengye / Deng, Qin et al. | Springer Verlag | 2022



    WHEEL ARCH WITH OPTIMIZED WHEEL ARCH LINING

    GREBERT JOHAN / SIMON DAVID / BRÉGEON PASCALINE et al. | Europäisches Patentamt | 2022

    Freier Zugriff