The exploitation of hydro energy resources usually needs to consider the comprehensive requirements of urban water supply, flood control, power generation, irrigation, shipping, ecological environment protection, aquaculture, and tourism. According to natural conditions, resource characteristics, construction conditions, social and economic development, and environmental protection requirements of the downstream Congo River, the major exploitation task of this river section will focus on hydropower generation. It is necessary to coordinate the cascade setting and development layout of power plants, to make full use of hydropower resources. Meanwhile, a shipping hub can be established at the proper time. Local society and economy will be promoted as well as ecological environment.
Development Scheme of Hydropower on Downstream Congo River
Research on Hydropower Development and Delivery in Congo River ; Kapitel : 3 ; 40-69
07.04.2020
30 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Ob River Channel Transformation Downstream of Novosibirsk Hydropower Plant (West Siberia, Russia)
HENRY – Bundesanstalt für Wasserbau (BAW) | 2008
|Hydrology of lower Congo River
Engineering Index Backfile | 1938
|Hydrology of lower Congo River
Engineering Index Backfile | 1938
|Hydrology of lower Congo River
Engineering Index Backfile | 1938
|