This chapter provides guidance for the assessment of FPI mooring systems when the intended period of operation at the original site or the cumulated operating time at both the original and relocated sites is extended beyond the original design life.
Example of Mooring System Life Extension
Springer Ser.Naval Architect., Marine Engineer., Shipbuilding, Shipping
21.07.2024
4 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
LIUHUA 11-1 FPSO & FPS MOORING SYSTEM LIFE EXTENSION EVALUATION AND CHALLENGING ISSUES
British Library Conference Proceedings | 2019
|