This erratum is published to notify an error of a reference which was cited in-text, but not mentioned in the references section. See revised reference below: Errata: Jung, J. H., Chung, H., Kwon, Y. S., and Lee, I. M. (2019). “An ANN to predict ground condition ahead of tunnel face using TBM operational data.” KSCE Journal of Civil Engineering, Vol. 23, No. 7, pp. 3200–3206, DOI: https://doi.org/10.1007/s12205-019-1460-9 . The original article has been corrected.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Erratum to: Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application


    Beteiligte:
    Chung, Heeyoung (Autor:in) / Lee, In-Mo (Autor:in) / Jung, Jee-Hee (Autor:in) / Park, Jeongjun (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    30.11.2018


    Format / Umfang :

    1 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Erratum to: Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application

    Chung, Heeyoung / Lee, In-Mo / Jung, Jee-Hee et al. | Online Contents | 2019


    Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application

    Chung, Heeyoung / Lee, In-Mo / Jung, Jee-Hee et al. | Springer Verlag | 2018


    Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application

    Chung, Heeyoung / Lee, In-Mo / Jung, Jee-Hee et al. | Online Contents | 2019


    Risk management and expert system development methodology

    Hull, Larry / Gilstrap, Lewey | NTRS | 1991


    Risk management and expert system development methodology

    HULL, LARRY / GILSTRAP, LEWEY | AIAA | 1991