Urban rail transit (URT) is popular in many big cities because of its advantage of traffic performance. Affected by the whole life cycle, URT lines often involve renovation projects. In view of the increasing needs for the renovation of URT signal systems, this paper studies the signal system and its interface, analyzes the general process of the renovation, and then discusses the careful planning, safety supervision and related ancillary works for the installation and debugging supervision in the renovation. Installation and debugging are the key link of a renovation. The content of this paper has guiding significance for the concrete implementation of renovation projects of URT signal systems.
Installation and debugging supervision for signal system renovation of urban rail transit
Eighth International Conference on Electromechanical Control Technology and Transportation (ICECTT 2023) ; 2023 ; Hangzhou, China
Proc. SPIE ; 12790 ; 127902K
07.09.2023
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Installation and debugging supervision for signal system renovation of urban rail transit
British Library Conference Proceedings | 2023
|Interlocking Interface Scheme for Urban Rail Transit Existing Depot Signaling System Renovation
DOAJ | 2024
|Two-way rail level detection and debugging device for rail transit
Europäisches Patentamt | 2022
|Research on Distribution of Integrated Supervision & Control Systems in Urban Rail Transit
British Library Conference Proceedings | 2022
|Research on Distribution of Integrated Supervision & Control Systems in Urban Rail Transit
Springer Verlag | 2022
|