The Singapore-Malaysia Second Link is a prestressed bod girder carrying a dual carriageway with three lanes on each carriage. The bridge serves as a relief to the existing crossing locate in northern Singapore. The bridge was compete in 1997 and opened to traffic in the same year. Owing to its importance a suite of instruments was installed in three segments of the bridge in order to monitor its short-term and long-term behavior and performance under construction loads, environmental loads, and vehicular loads. The paper present a description of the instrumentation, results of the monitoring during construction, and observations of the bridge response to loading during construction.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Monitoring of Singapore-Malaysia second link during construction


    Beteiligte:

    Kongress:

    Second International Conference on Experimental Mechanics ; 2000 ; Singapore,Singapore


    Erschienen in:

    Erscheinungsdatum :

    13.06.2001





    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    SINGAPORE & MALAYSIA

    Online Contents | 1999


    Malaysia & Singapore Handbook

    Day, Alan | Emerald Group Publishing | 1997



    Malaysia Handbook, with Singapore 3rd edition

    Williamson, Joan | Emerald Group Publishing | 2001