PLATO (PLAnetary Transits and Oscillations of stars) is an M3 medium-class space mission in ESA’s Cosmic Vision program devoted to detecting and studying a large number of extrasolar planetary systems. Its launch is planned for the end of 2026 from Europe’s Spaceport in French Guiana. The PLATO Payload consists of 26 wide field-of-view Cameras, each observing a specific part of the sky, associated data processing units and power supply units. The 24 Normal-Cameras will provide a very high-resolution photometric measurement of light from a large number of stars, while the other two Fast Cameras will provide the colour information and will deliver the pointing data to the AOCS (Attitude and Orbital Control System). The Cameras will be integrated into an optical bench. Each of them is composed of the Telescope Optical Unit (TOU), the Focal Plane Assembly (FPA) and the Front-End Electronics (FEE). Currently, the serial production of the Cameras has already started facing critical key points, non-conformities and challenging problems. The status of the Product Assurance activities during the serial production for which the first flight models are being delivered after the AIT phase is reported.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Status of the PLATO camera product assurance activities and their management


    Beteiligte:
    Egner, Sébastien E. (Herausgeber:in) / Roberts, Scott (Herausgeber:in) / Auricchio, Natalia (Autor:in) / Chinellato, Simonetta (Autor:in) / Huesler, Joseph (Autor:in) / Kondofersky, Ilina (Autor:in) / Fischer, Holger (Autor:in) / Brienza, Daniele (Autor:in) / Cogato, Fabrizio (Autor:in) / Santiago Pe, Amaia (Autor:in)

    Kongress:

    Modeling, Systems Engineering, and Project Management for Astronomy XI ; 2024 ; Yokohama, Japan


    Erschienen in:

    Proc. SPIE ; 13099


    Erscheinungsdatum :

    23.08.2024





    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Product assurance for the PLATO Telescope optical unit

    Chinellato, Simonetta / Postiglione, Giovanni / Bandy, Timothy et al. | SPIE | 2020


    The TOU of the PLATO mission: product assurance management during flight models production

    Chinellato, Simonetta / Macri, Emanuele Alberto / Cicciarelli, Chiara et al. | SPIE | 2024


    The TOU of the PLATO mission from a product assurance point of view

    Chinellato, Simonetta / Auricchio, Natalia / Postiglione, Giovanni et al. | SPIE | 2022


    Product assurance management and software product assurance

    Schneider, C. / Borycki, G. / Panaroni, P. et al. | NTRS | 1991


    Alignment and integration of the first PLATO camera

    Royer, P. / Baeke, A. / Terrasa, G. et al. | Deutsches Zentrum für Luft- und Raumfahrt (DLR) | 2022

    Freier Zugriff