The problem of testing large gas turbines at full load in the factory has been solved with the construction of a load test facility utilizing a gas turbine compressor as the load absorption device. Design philosophy and features are reviewed, and a summary, of operating experience to date is presented.
100,000 HP Gas Turbine Load Test Facility
Sae Technical Papers
1976 Automotive Engineering Congress and Exposition ; 1976
1976-02-01
Aufsatz (Konferenz)
Englisch
Test of an ingoldsby 100,000 lbs
Engineering Index Backfile | 1902
Engineering Index Backfile | 1901
Hoeco to install Asia's first 100,000-lb. test cell
Online Contents | 1994
Canda's 100,000 lbs. capacity cars
Engineering Index Backfile | 1899
Diesel-electric locomotives save $100,000
Engineering Index Backfile | 1937
|