Methods for controlling execution order in traditional text-based languages such as C and Fortran are well established. The transition to graphical programs has revealed some of the hidden issues inherent in any scheduling routine, specifically data dependency and data protection (in multirate systems). Graphical programming languages provided built-in diagnostics that allow users to analyze the data dependencies to develop optimal schedules from a data propagation perspective. This paper examines one heuristic that can be used to develop an optimal schedule for an arbitrary model.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Optimal Scheduling in Graphical Modeling Environments


    Weitere Titelangaben:

    Sae International Journal of Passenger Cars- Electronic and Electrical Systems
    Sae Int. J. Passeng. Cars – Electron. Electr. Syst


    Beteiligte:
    Burke, Michael (Autor:in)

    Kongress:

    SAE World Congress & Exhibition ; 2009



    Erscheinungsdatum :

    2009-04-20


    Format / Umfang :

    6 pages




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Optimal scheduling in graphical modeling environments

    Burke,M. / The Mathworks,GB | Kraftfahrwesen | 2009


    2009-01-0268 Optimal Scheduling in Graphical Modeling Environments

    Burke, M. / Society of Automotive Engineers | British Library Conference Proceedings | 2009



    Automated testing of graphical models in heterogeneous test environments

    Beresnev,A. / Rumpe,B. / Schroven,F. et al. | Kraftfahrwesen | 2009


    A graphical construct of time optimal trajectories

    ZAGALSKY, N. / IRONS, JR., R. / LINDQUIST, O. | AIAA | 1972