A summary of the Space Operations Center (SOC) crew skill and scheduling analysis is presented in this paper. The analysis was conducted by Boeing Aerospace Company on contract to NASA-Johnson Space Center. Brief descriptions of the SOC design, projected missions, and mission modeling are presented. The analytical approach is outlined as well as the resulting crew skill allocations and projected crew sizes through the year 2000.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Space Operations Center Crew Skills and Scheduling


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    Aerospace Congress and Exposition ; 1982



    Erscheinungsdatum :

    1982-02-01




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Space station crew operations

    Aller, R. | NTRS | 1970




    Aircraft and Crew Scheduling during Airlift Operations

    R. D. Armstrong / A. Charnes / S. Samn | NTIS | 1981


    CREW SCHEDULING SYSTEM AND CREW SCHEDULING METHOD

    KUBO HIDEKI | Europäisches Patentamt | 2017

    Freier Zugriff