Simultaneous engineering techniques have been applied to a SMC truck hood to reduce the lead-time for production introduction from 22 months to 12 months. Several other technologies were also applied to insure a successful product introduction in this reduced timeframe: computer definition of the hood surface for accuracy, RTM prototype tooling for early design tryout and durability testing, Finite Element Analysis to further confirm durability of the hood structure, and brittle lacquer combined with strain gaging to provide life data using a hydraulic road simulator for load inputs.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    SMC Heavy Duty Truck Hood; 12 Months From Concept to Production


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Krebs, John (Autor:in) / Strause, Peter W. (Autor:in) / Morrison, Robert W. (Autor:in) / Pienta, Walter (Autor:in)

    Kongress:

    SAE International Truck and Bus Meeting and Exposition ; 1988



    Erscheinungsdatum :

    1988-10-01




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    SMC heavy duty truck hood; 12 months from concept to production

    Morrison,R.W. / Strause,P.W. / Pienta,W. et al. | Kraftfahrwesen | 1988


    SMC heavy duty truck hood: 12 months from concept to production

    Morrison, R.W. / Strause, P.W. / Pienta, W. et al. | Tema Archiv | 1988


    Off-highway heavy-duty truck under-hood thermal analysis

    Mao, Shaolin / Feng, Zhigang / Michaelides, E.E. | Tema Archiv | 2010


    Concept for a Freight Efficient Heavy Duty Truck Chassis

    Ostergaard, Erik / Angelini, Nicholas / Aguero, Raymond | SAE Technical Papers | 2020


    Innovative variable turbine concept for heavy duty truck engines

    Chebli,E. / Casey,M. / Mueller,M. et al. | Kraftfahrwesen | 2010