REVISION IS REQUIRED TO REMOVE WORD-FOR-WORD CONVERSION INFORMATION, TO CREATE A REQUIREMENTS SECTION AND MOVE THE CURRENT REQUIREMENTS FROM THE NOTES SECTION, TO CLARIFY PART NUMBER EXAMPLE, TO UPDATE REFERENCES, AND TO REVIEW/COORDINATE FOR OTHER NEEDED CHANGES. AS33731A HAS BEEN REAFFIRMED TO COMPLY WITH THE SAE FIVE-YEAR REVIEW POLICY.
STRIP, MOUNTING, NUT INSULATING, FOR AS27212 TERMINAL BOARD
04.05.2023
Aufsatz (Konferenz)
Englisch
STRIP, MOUNTING, NUT INSULATING, FOR MS27212 TERMINAL BOARD
SAE Technical Papers | 2009
MOUNTING STRUCTURE OF WEATHER STRIP AND WEATHER STRIP
Europäisches Patentamt | 2019
|