The problem of supplying JIT assembly workstations from a central depot with a goal of minimizing inventory and vehicle requirements is the focus of this paper. To minimize work-in-process inventory, the quantity of component parts delivered to each workstation must be just enough to satisfy production until the next delivery of components. To minimize vehicle requirements, there should be no vehicle idle time. The problem is modeled as a vehicle routing problem with a nonlinear capacity constraint. A heuristic solution procedure is outlined and a relaxed formulation is given to provide a lower bound on the number of vehicles required.
Planning Material Handling Vehicle Routes for Internal Just-In-Time Operations
Sae Technical Papers
Southern Automotive Manufacturing Conference & Exposition ; 1999
28.09.1999
Aufsatz (Konferenz)
Englisch
Planning material handling vehicle routes for internal just-in-time operations
| Kraftfahrwesen | 1999
Interfaces for Planning Vehicle Routes
| NTRS | 2001
SYSTEMS AND METHODS FOR TRANSFERRING ROUTES BETWEEN MATERIAL HANDLING VEHICLES
| Europäisches Patentamt | 2021
Systems and methods for transferring routes between material handling devices
| Europäisches Patentamt | 2021
Producting perfect parts at just-in-time rates: a material handling solution
| Tema Archiv | 1986