An uncomplicated, straightforward, and flexible system of associating costs with program milestones is presented. Costs are associated with milestones without expanding the basic PERT network, or requiring significant accounting structure changes. Computerized printouts reflect combined program cost and schedule status. The PERT cost milestone system permits predicting and reporting of cost and schedule status by end items of the contract.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Graphic PERT/Cost Milestone Reporting


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Swim, R. K. (Autor:in)

    Kongress:

    Pre-1964 SAE Technical Papers ; 1906



    Erscheinungsdatum :

    01.01.1962




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch



    Graphic PERT/cost milestone reporting

    Swim, R.K. | Engineering Index Backfile | 1962


    Milestone Reporting, Management by Exception

    R. C. Allen / F. J. Gallagher | NTIS | 1966


    Pert Cost and the L.a.S

    L. A. Potter | NTIS | 1965


    A concept of PERT-cost management

    Muntean, William G. | TIBKAT | 1962


    DOD and NASA guide PERT COST : systems design

    USA, Department of Defense / USA, National Aeronautics and Space Administration | TIBKAT | 1962