This SAE Recommended Practice covers the design and application of primary on-board wiring distribution system harnessing for surface vehicles. This document is intended for single phase nominal 120 VAC circuits that provide power to truck sleeper cab hotel loads so that they may operate with the main propulsion engine turned off. The power supply comes from alternative sources such as land-based grid power, DC-AC inverters and auxiliary power generators. The circuits may also provide power to improve vehicle performance through charging batteries or operating cold-weather starting aids. Not applicable.
Primary Single Phase Nominal 120 VAC Wiring Distribution Assembly Design—Truck and Bus
2008-01-14
Aufsatz (Konferenz)
Englisch
Primary Single Phase Nominal 120 VAC Wiring Distribution Assembly Design—Truck and Bus
SAE Technical Papers | 2014
Primary Single Phase Nominal 120 VAC Wiring Distribution Assembly Design—Truck and Bus
SAE Technical Papers | 2018
Primary Single Phase Nominal 120 VAC Wiring Distribution Assembly Design—Truck and Bus
SAE Technical Papers | 2022
Truck, Truck-Tractor, Trailer, and Motor-Coach Wiring
SAE Technical Papers | 1981
AUTOMOBILE, TRUCK, TRUCK-TRACTOR, TRAILER, AND MOTOR COACH WIRING
SAE Technical Papers | 1981