The objective in a flexible manufacturing system is an optimal system resources scheduling. The production scheduling of such system may be resolved by a set of individual agents, which can work parallel and their coordination may bring a more effective way to find an optimal solution. Criteria for the optimal solution may be created on the time or economical (cost) basis but each may have a different priority depending on each situation. In this paper we will analyse an approach to find a feasible schedule of all products, which could minimize their costs and satisfy all constrains jointed with each product.
Agent Based Scheduling in Production System
Sae Technical Papers
Automotive and Transportation Technology Congress and Exposition ; 2001
2001-10-01
Aufsatz (Konferenz)
Englisch
Agent based scheduling in production system
Kraftfahrwesen | 2001
|2001-01-3225 Agent Based Scheduling in Production System
British Library Conference Proceedings | 2001
|Web3.0-based multi-agent collaborative scheduling system and method
Europäisches Patentamt | 2023
|