Ford Motor Company Powertrain Engineering instituted an innovative Work Process Plan designed to evaluate, develop, and improve it's selected long-term supplier base. This process was implemented in 1987 and continues to function improving our suppliers capabilities in the areas of Product & Manufacturing Engineering, Quality, Production Control, and Sales/Purchasing Interaction.A pilot Supply Base Development, Casting and Machining team was set -up in July, 1987 to assist the casting, machining, piston, and ring supply base. The success of this team lead to the fornation of three additional Supply Base Development teams within the following year to assist suppliers in Sealing, Assemblies, and Front End Accessory Drive (FEAD) commodities.The benefits of this process to Ford and it's suppliers has resulted in assisting two suppliers to reach the TQE level, support the Ford directive to bring all suppliers to the Q-1 level, guide suppliers not meeting the minimum technical levels required by Ford Powertrain to meet those levels, and institute cross-functional training and team building at Ford and it's suppliers.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Supplier Improvement Process Plan


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    International Congress & Exposition ; 1994



    Erscheinungsdatum :

    01.03.1994




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Supplier improvement process plan

    Fauteck,R.D. / Studzinski,G.C. / Ford Motor,US | Kraftfahrwesen | 1994


    Supplier Improvement Process Plan

    Fauteck, R. D. / Studzinski, G. C. / SAE | British Library Conference Proceedings | 1994