This paper describes the computer model developed to simulate construction of the eleven million cu yd gravel dam at Manic 3, and outlines the results obtained. Construction of the dam is a complex task influenced by many random events.Manic 3 is part of Hydro-Quebec's Manicouagan-Outardes hydroelectric development, which will ultimately comprise seven power stations with a combined capacity of 5.5 million kW.Before simulation was introduced, it was extremely difficult to solve the many problems involved in choosing and utilizing equipment, obtaining accurate time and cost estimates, and formulating realistic production schedules.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Construction Simulation of the Main Earth Dam at Manicouagan 3


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Gravelle, A. G. (Autor:in) / Frenois, J. P. (Autor:in) / Godbout, Serge (Autor:in)

    Kongress:

    Farm, Construction, Industrial Machinery and Powerplant Meetings ; 1970



    Erscheinungsdatum :

    1970-02-01




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Petrology, structure and origin of the Manicouagan melt sheet, Quebec, Canada - A preliminary report

    Floran, R. J. / Phinney, W. C. / Warner, J. L. et al. | NTRS | 1976



    Main development trends in aircraft construction

    Schmarsow, G. | Engineering Index Backfile | 1956


    Main factors in modern diesel engine construction

    Blache, H.H. | Engineering Index Backfile | 1934


    Construction elevator main cable anti-theft device

    ZHANG YANHUA / ZHANG LU / ZHANG JIAN et al. | Europäisches Patentamt | 2020

    Freier Zugriff