Life cycle cost estimates are made for an architecture (family) consisting of advanced space systems. An evaluation of the acquisition phases indicates that a very large percentage of these costs occur in manufacturing. A review of the costing methodology utilized in unit production costs indicates that the data base does not reflect the type of advanced manufacturing processes that would exist when the space systems become operational (in the 21st century). A review is made of the attributes of the factory of the future, and the impact it could have on current cost models used in planning program budgets. Several examples are presented to show the unit production cost saving obtainable when advanced manufacturing processes are applied to high technology areas such as mechanical and electrical space systems, and microelectronic applications (i.e., data processor). The overall implication is that cost reductions up to an order of magnitude are possible in the near time frame if these advanced manufacturing processes are initiated in a revolutionary, rather than an evolutionary manner.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Forecasting (21st Century) Production Costs of Advanced Space Systems


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Forster, Allan (Autor:in)

    Kongress:

    SAE Aerospace Technology Conference and Exposition ; 1986



    Erscheinungsdatum :

    01.10.1986




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    21St Century Atmospheric Forecasting for Space Based Applications

    Alliss, Randall J. | British Library Conference Proceedings | 2016


    Advanced Space Propulsion for the 21st Century

    Robert H. Frisbee | AIAA | 2003



    Space Power Systems for the 21st Century

    Teofilo, Vincent | AIAA | 2006