The general aspects of selecting an optimum or least cost hydraulic thrust vector control system is covered. Cost includes: l) development cost, 2) unit cost, 3) the cost of weight, 4) the cost of failures, 5) the cost of low system response, 6) the cost of a short system life or operating time and 7) the cost of a long development time. This paper describes the development of a computer program for system cost investigations. The need for such investigations is discussed and results for a few specific systems presented.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Selection of a Least “Cost” Hydraulic System for Launch Vehicle Engine Position Control


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Moody, D. R. (Autor:in) / Nakai, M. (Autor:in)

    Kongress:

    Aerospace Fluid Power Systems and Equipment Conference ; 1965



    Erscheinungsdatum :

    01.02.1965




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Launch Vehicle Engine Selection Using Probabilistic Techniques

    Krevor, Zachary / Wilhite, Alan | AIAA | 2007



    Launch Vehicle Cost Trends

    Rutledge, W. S. | British Library Online Contents | 1994


    AMROC Industrial Launch Vehicle: A Low Cost Launch Vehicle

    French, J. R. | SAE Technical Papers | 1987


    LAUNCH VEHICLE COST TRENDS

    Rutledge, William S. | Online Contents | 1994