The Minus Eighty degrees Celsius Laboratory Freezer for ISS (MELFI) will be the first freezer to be delivered to NASA as Laboratory Support Equipment (LSE) by ESA. Among the MELFI thermal requirements, the rapid freezing of samples to a required temperature and the low power consumption that limits MELFI performance during re-cooling phases after power off, are ones of the most critical. This paper will present the thermal activities, which led both to a verification of those requirements and to a complete thermal characterization of MELFI.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    MELFI Thermal Characterization and Verification from Subsystem to System


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    31st International Conference On Environmental Systems ; 2001



    Erscheinungsdatum :

    09.07.2001




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    MELFI Thermal Characterization and Verification from Subsystem to System

    Chegancas, J. / Le Gall, V. / SAE | British Library Conference Proceedings | 2001


    MELFI Cooling Performance Characterization and Verification

    Colangelo, G. / De Parolis, M. N. / Ibanez, J. J. et al. | British Library Conference Proceedings | 2000


    MELFI Cooling Performance Characterization and Verification

    Colangelo, Giovanni / Ibanez, Jesus Jimenez / De Parolis, Maria Natalina | SAE Technical Papers | 2000


    MELFI Thermal Verification Before the First Flight

    Cheganças, Jean / Le Gall, Virginie | SAE Technical Papers | 2002


    Adaptive Control Laws for the Thermal Management of MELFI: From Design to Validation

    Jaupitre, A. / European Space Agency | British Library Conference Proceedings | 2003