The preliminary design of the Japanese Experiment Module (JEM) has started in January 1990. As a result of the JEM configuration review activity which was focused on the development cost and schedule prior to getting into the preliminary design, a part of the JEM Environmental Control and Life Support System (ECLSS) functions was changed.This paper presents the JEM ECLS system baseline and the subsystem configuration at the start of the Phase C/D. Also the outline of the preliminary cabin air ventilation testing which started in March 1989 is described.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Status of JEM ECLSS Design


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Hattori, A. (Autor:in) / Otsuki, F. (Autor:in) / Iwasaki, H. (Autor:in) / Yamaguchi, N. (Autor:in) / Suzuki, T. (Autor:in) / Yoshida, Y. (Autor:in)

    Kongress:

    International Conference On Environmental Systems ; 1990



    Erscheinungsdatum :

    01.07.1990




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    MSFC ECLSS Overview

    Cara Shelby Johnson Black / Paul E Hintze | NTRS



    International Space Station ECLSS Operations Status - Increment 0A

    Lamczyk, Philip C. | SAE Technical Papers | 1999


    International Space Station ECLSS Operation Status - Increment OA

    Lamczyk, P. C. / SAE | British Library Conference Proceedings | 1999


    International Space Station ECLSS Operations Status - Increment OA

    Lamczyk, Philip C. / Cobb, Carey T. | NTRS | 1998