Best Price Sam is a very competitive contractor who is always looking for a new contract and is forever looking for a way to cut costs and get the lowest bid. He tells everyone he is looking out for the owner by always looking for the best way to meet their needs at the lowest price. He is looking at a contract to build a very large retaining wall out of split face block with a geotechnical grid to provide stability to the soils. The project, designed by Johnny Appleseed Geotechnical Engineers, was developed after analyzing both the engineering aspects of the soil as well as the chemical aspects of the soil. While it is clear that Johnny Appleseed was not directly involved in the construction, it is also clear they made no effort to inform their client of the limitations of the design. The contractor clearly violated the contract requirements and should be available to address the post-construction concerns.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Bad Choices


    Erschienen in:

    ITE journal ; 87 , 7


    Erscheinungsdatum :

    2017



    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch



    Klassifikation :

    BKL:    55.00 Technik der Verkehrsmittel, Verkehrswesen: Allgemeines
    Lokalklassifikation TIB:    770/7010



    Hard choices

    Online Contents | 2001


    Smart choices

    Scoltock,J. / PSA Peugeot Citroen,FR | Kraftfahrwesen | 2015



    Compact Choices

    Online Contents | 2008


    Automatic choices

    Blakemore,T. / Wilcox,D. / Mercedes-Benz,Stuttgart,DE et al. | Kraftfahrwesen | 2007