This paper proposes a construction method for battery systems that are widely used in industries. The battery system uses a building block structure combined with a battery module, whose capacity is less than 1 kWh. To manage the building block structured system, we propose a hierarchical structured management method. In each hierarchy, the voltage and temperature of the battery are monitored, and the information necessary for calculating charge states and detecting faults are sent to the upper hierarchy for the state management of the lower hierarchy. Furthermore, to ensure the safety during maintenance activities, we provide a guidance for understanding the insulation structure for the battery module, and develop a ground fault detection method that detects a decline in the insulation performance by using a rising method. For the experiment, we use a 30‐kWh trial manufacture battery system combined with the hierarchical management method. We verify that charge states and faults are detected in the battery of the system, and confirm that the system can be charged and discharged safely.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Study on Construction of Industrial Large‐Scale Battery System



    Erschienen in:

    Erscheinungsdatum :

    2017




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch



    Klassifikation :

    Lokalklassifikation TIB:    770/5600/8000
    BKL:    53.00 Elektrotechnik: Allgemeines / 52.53 / 53.00 / 53.33 / 53.31 / 53.33 Elektrische Maschinen und Antriebe / 53.31 Elektrische Energieübertragung / 52.53 Kraftwerkstechnik



    Matrix type energy storage battery container large-scale construction site and construction method

    QI LINPAN / WANG CHUNTAO / ZHANG KAI et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    DYNAMICALLY RECONFIGURABLE FRAMEWORK FOR A LARGE-SCALE BATTERY SYSTEM

    KIM HAHNSANG / SHIN KANG G | Europäisches Patentamt | 2015

    Freier Zugriff


    Railway construction resumed on large scale

    Engineering Index Backfile | 1924


    Industrial design large-scale modeling mobile lifting device

    WU HAN / KUANG LINGYAN / LI YANYAN | Europäisches Patentamt | 2024

    Freier Zugriff