Track substructure renewal on Polish State Railways - Over the years, the condition of the track substructure on Polish State Railways (PKP) gradually deteriorated to the stage that a large part of their network was badly in need of substructure repair. Since November 1999, the Plasser & Theurer AHM 800-R formation rehabilitation machine has been working on PKP, achieving a high output and accuracy of work.
Rail engineering international ; 31 , 2 ; 4-6
2002
Aufsatz (Zeitschrift)
Englisch
Track substructure renewal on Polish State Railways
British Library Online Contents | 2002
British Library Online Contents | 2001
IuD Bahn | 1995
|