An Engineering-of-Failure approach to designing and executing an accelerated product qualification test was performed to support a risk assessment of a work-around necessitated by an on-orbit failure of another piece of hardware on the Mars Global Surveyor spacecraft.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies


    Beteiligte:
    Larson, T. (Autor:in) / Gibbel, M. (Autor:in)

    Erscheinungsdatum :

    1999-06-13


    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch