An Engineering-of-Failure approach to designing and executing an accelerated product qualification test was performed to support a risk assessment of a work-around necessitated by an on-orbit failure of another piece of hardware on the Mars Global Surveyor spacecraft.
Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies
1999-06-13
Sonstige
Keine Angabe
Englisch
failures , testing , wirebond , accelerated , stress
Online Contents | 1997
|NTRS | 1996