This paper reports on the development of a parametric cost model that is being built at JPL to estimate costs of future, deep space, robotic science missions. Because of the changes in the mission implementation process and technology changes, the model is being built in a dramatically different manner than past models which have had access to a data base that drew heavily on the correlation between mass and actual costs.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    An Unmanned Spacecraft Subsystem Cost Model for Advance Mission Planning


    Beteiligte:
    Rosenberg, L. (Autor:in) / Madrid, G. (Autor:in)

    Erscheinungsdatum :

    05.06.2000


    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :


    An unmanned spacecraft subsystem cost model for advance mission planning

    Madrid, George A. / Rosenberg, Leigh | TIBKAT | 2000


    An Unmanned Spacecraft Subsystem Cost Model for Advance Mission Planning

    Madrid, G. A. / Rosenberg, L. / Society of Allied Weight Engineers | British Library Conference Proceedings | 2000