This paper reports on the development of a parametric cost model that is being built at JPL to estimate costs of future, deep space, robotic science missions. Because of the changes in the mission implementation process and technology changes, the model is being built in a dramatically different manner than past models which have had access to a data base that drew heavily on the correlation between mass and actual costs.
An Unmanned Spacecraft Subsystem Cost Model for Advance Mission Planning
05.06.2000
Sonstige
Keine Angabe
Englisch
Parametric , Cost , Model
An Unmanned Spacecraft Subsystem Cost Model for Advance Mission Planning
British Library Conference Proceedings | 2000
|