Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5- parameter cost model that explains 93% (Adjusted R2) of the cost variation in a database of 46 total ground and space telescope assemblies. This model can be used to estimate the most probably cost for the Habitable Exoplanet Telescope Assembly.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Optical Telescope Assembly Cost Estimating Model


    Beteiligte:

    Kongress:

    The Space Astrophysics Landscape for the 2020s and Beyond ; 2019 ; Potomac, MD, United States


    Erscheinungsdatum :

    2019-04-01


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    HabEx Optical Telescope Assembly

    Stahl, H. Philip | NTRS | 2017


    HabEx Optical Telescope Assembly

    H. P. Stahl | NTIS | 2017



    Spherical Primary Optical Telescope (SPOT): A Cost-effective Space Telescope Architecture

    Feinberg, L. / IEEE | British Library Conference Proceedings | 2005


    Cost Modeling for Space Optical Telescope Assemblies

    H. P. Stahl / T. Henrichs / A. Luedtke et al. | NTIS | 2011