This paper describes how the Orion program is implementing new and innovative test approaches and strategies in an evolving development environment. The early flight test spacecraft are evolving in design maturity and complexity requiring significant changes in the ground test operations for each mission. The testing approach for EM-2 is planned to validate innovative Orion production acceptance testing methods to support human exploration missions in the future. Manufacturing and testing at Kennedy Space Center in the Neil Armstrong Operations and Checkout facility will provide a seamless transition directly to the launch site avoiding transportation and checkout of the spacecraft from other locations.
Innovative Test Operations to Support Orion and Future Human Rated Missions
AIAA Space 2017 Conference ; 2017 ; Orlando, FL, United States
2017-09-12
Aufsatz (Konferenz)
Keine Angabe
Englisch
Innovative Test Operations to Support Orion and Future Human Rated Missions (AIAA 2017-5145)
British Library Conference Proceedings | 2017
|Future SLS-Orion Missions Supporting Evolution to Mars
AIAA | 2015
|Future SLS-Orion Missions Supporting Evolution to Mars (AIAA 2015-4441)
British Library Conference Proceedings | 2015
|