The GRAIL mission is on track to satisfy all prime mission requirements. The performance of the orbiters and payload has been exceptional. Detailed pre-launch operations planning and validation have paid off. Prime mission timeline has been conducted almost exactly as laid out in the mission plan. Flight experience in the prime mission puts the flight team in a good position for completing the challenges of the extended mission where the science payoff is even greater
Operating the Dual-Orbtier GRAIL Mission to Measure the Moon's Gravity
SpaceOps 2012, Stockholm, Sweden, June 11-15, 2012 ; 2012 ; Stockholm, Sweden
2012-06-11
Sonstige
Keine Angabe
Englisch
Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity
British Library Conference Proceedings | 2012
|Operating the Dual-Orbiter GRAIL Mission
AIAA | 2012
|NTRS | 2019
|