A Technical Interchange meeting was held between the payload developers for the Boiling eXperiment Facility (BXF) and the NASA Safety Review Panel concerning operational anomaly that resulted in overheating one of the fluid heaters, shorted a 24VDC power supply and generated Perfluoroisobutylene (PFiB) from Perfluorohexane.
Boiling eXperiment Facility (BXF) Fluid Toxicity Technical Interchange Meeting (TIM) with the Payload Safety Review Panel (PSRP)
Fluid Toxicity Interchange Meeting ; 2012 ; Houston, TX, United States
2012-06-14
Sonstige
Keine Angabe
Englisch
NASA-Wide Fastener Technical Interchange Meeting
NTIS | 1995
|NASA AAM Weather Technical Interchange Meeting
NTIS | 2023
|