This slide presentation reviews creating a preliminary multi-variable cost model for the contract costs of making a space telescope. There is discussion of the methodology for collecting the data, definition of the statistical analysis methodology, single variable model results, testing of historical models and an introduction of the multi variable models.
Preliminary Multi-Variable Parametric Cost Model for Space Telescopes
SPIE Astronomy meeting ; 2010 ; San Diego, CA, United States
31.07.2010
Sonstige
Keine Angabe
Englisch