NASA is committed to the development of a new crew launch vehicle, the Ares I, that can support human missions to low Earth orbit (LEO) and the moon with unprecedented safety and reliability. NASA's Constellation program comprises the Ares I and Ares V launch vehicles, the Orion crew vehicle, and the Altair lunar lander. Based on historical precedent, stage separation is one of the most significant technical and systems engineering challenges that must be addressed in order to achieve this commitment. This paper surveys historical separation system tests that have been completed in order to ensure staging of other launch vehicles. Key separation system design trades evaluated for Ares I include single vs. dual separation plane options, retro-rockets vs. pneumatic gas actuators, small solid motor quantity/placement/timing, and continuous vs. clamshell interstage configuration options. Both subscale and full-scale tests are required to address the prediction of complex dynamic loading scenarios present during staging events. Test objectives such as separation system functionality, and pyroshock and debris field measurements for the full-scale tests are described. Discussion about the test article, support infrastructure and instrumentation are provided.
Ares I Stage Separation System Design Certification Testing
56th JANNAF Propulsion Meeting ; 2009 ; Las Vegas, NV, United States
2009-04-14
Aufsatz (Konferenz)
Keine Angabe
Englisch
ARES I AND ARES I-X STAGE SEPARATION AERODYNAMIC TESTING
British Library Conference Proceedings | 2011
|Ares I and Ares I-X Stage Separation Aerodynamic Testing
Online Contents | 2012
|Ares I and Ares I-X Stage Separation Aerodynamic Testing
NTRS | 2011
|Ares I and Ares I-X Stage Separation Aerodynamic Testing
AIAA | 2011
|Ares I and Ares V First Stage - Powering Exploration
NTRS | 2008
|