The NASA Constellation Program (CxP) is developing a two-element Earth-to-Orbit launch system to enable human exploration of the Moon. The first element, Ares I, is a human-rated system that consists of a first stage based on the Space Shuttle Program's solid rocket booster (SRB) and an upper stage that consists of a four-crew Orion capsule, a service module, and a Launch Escape System. The second element, Ares V, is a Saturn V-plus category launch system that consists of the core stage with a cluster of six RS-68B engines and augmented with two 5.5-segment SRBs, a Saturn-derived J-2X engine powering an Earth Departure Stage (EDS), and the lunar-lander vehicle payload, Altair. Initial plans called for the Ares V to be launched first, followed the next day by the Ares I. After the EDS performs the final portion of ascent and subsequent orbit circularization, the Orion spacecraft then performs a rendezvous and docks with the EDS and its Altair payload. Following checkout, the integrated stack loiters in low Earth orbit (LEO) until the appropriate Trans-Lunar Injection (TLI) window opportunity opens, at which time the EDS propels the integrated Orion Altair to the Moon. Successful completion of this 1 1/2-launch solution carries risks related to both the orbital lifetime of the assets and the probability of achieving the launch of the second vehicle within the orbital lifetime of the first. These risks, which are significant in terms of overall system design choices and probability of mission success, dictated a thorough reevaluation of the launch strategy, including the order of vehicle launch and the planned time period between launches. The goal of the effort described in this paper was to select a launch strategy that would result in the greatest possible expected system performance, while accounting for launch risks and the cost of increased orbital lifetime. Discrete Event Simulation (DES) model of the launch strategies was created to determine the probability of a second launch not occurring in a timely fashion (i.e., before the assets waiting in LEO expire). An overview of the launch strategy evaluation process is presented, along with results of specific cases that were analyzed. A high-level comparison of options is then presented, along with the conclusion derived from the analysis.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Launch Order, Launch Separation, and Loiter in the Constellation 1 1/2-Launch Solution


    Beteiligte:
    Stromgren, Chel (Autor:in) / Cates, Grant (Autor:in) / Cirillo, William (Autor:in)

    Kongress:

    2009 IEEE Aerospace Conference ; 2009 ; Big Sky, MT, United States


    Erscheinungsdatum :

    2009-03-07


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Launch order, launch separation, and loiter in the constellation 1½-launch solution

    Stromgren, Chel / Cates, Grant / Cirillo, William | IEEE | 2009


    Constellation Launch Vehicles Overview

    Cook, Steve / Fragola, Joseph R. / Priskos, Alex et al. | NTRS | 2009


    Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

    Gernand, J. / Gillespie, A. / Monaghan, M. et al. | British Library Conference Proceedings | 2010


    Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

    Gernand, Jeffrey L. / Gillespie, Amanda M. / Monaghan, Mark W. et al. | NTRS | 2010


    Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

    Gernand, Jeffery / Gillespie, Amanda / Monaghan, Mark et al. | AIAA | 2010