Provides preliminary findings of the initial series (normal operations and contingency management) of airspace operations simulations. The key elements of this report discuss feedback from controller subjects for UAS flight above FL430. Findings provide initial evaluation of routine UAS operations above dense ARTCC airspace (ZOB), and identify areas of further research, policy direction and procedural development. This document further serves as an addendum to the detailed AOS simulation plan (Deliverable SIM001), incorporating feedback from FAA air traffic personnel and Access 5 IPTs.
Preliminary Airspace Operations Simulations Findings Report
2005-10-31
Sonstige
Keine Angabe
Englisch
NTIS | 2023
|NTIS | 2022
|NTRS
|NTRS
|Airspace Operations and Constraints
AIAA | 2001
|