MRO project is a system of systems requiring system engineering team to architect, design, integrate, test, and operate these systems at each level of the project. The challenge of system engineering mission objectives into a single mission architecture that can be integrated tested, launched, and operated. Systems engineering must translate high-level requirements into integrated mission design. Systems engineering challenges were overcome utilizing a combination by creative designs built into MRO's flight and ground systems: a) Design of sophisticated spacecraft targeting and data management capabilities b) Establishment of a strong operations team organization; c) Implementation of robust operational processes; and d) Development of strategic ground tools. The MRO system has met the challenge of its driving requirements: a) MRO began its two-year primary science phase on November 7, 2006, and by July 2007, met it minimum requirement to collect 15 Tbits of data after only eight months of operations. Currently we have collected 22 Tbits. b) Based on current performance, mission data return could return 70 Tbits of data by the end of the primary science phase in 2008.
Mars Reconnaissance Orbiter Mission: Systems Engineering Challenges on the Mars Reconnaissance Orbiter Mission
Space Conference and Exposition ; 2007 ; Long Beach, CA, United States
2007-09-19
Aufsatz (Konferenz)
Keine Angabe
Englisch
Mars Reconnaissance Orbiter Mission
AIAA | 2003
|Mars Reconnaissance Orbiter mission
NTRS | 2001
|The Mars Reconnaissance Orbiter Mission
British Library Conference Proceedings | 2005
|The Mars reconnaissance orbiter mission
IEEE | 2004
|