The main goal of this paper is to extend the results of Gomez et al, 2001, related to the execution of the formation manoeuvres of the TPF constellation, including the controls for the station keeping and allowing a greater flexibility in the basic manoeuvres to be done by the formation.
Study on the Station Keeping Maintenance for the TPF Mission
AAS Astrodynamics Specialist Conference ; 2005 ; Lake Tahoe, CA, United States
2005-08-07
Preprint
Keine Angabe
Englisch
Study on the Station Keeping Maintenance for the TPF Mission (AAS 05-424)
British Library Conference Proceedings | 2006
|Station-keeping HAPS mission through optimal sprint and drift trajectories
Elsevier | 2024
|NTRS | 1967
|