The U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for a safer, simpler, more cost efficient launch system that could deliver timely human-rated space transportation capabilities. NASA's finite resources yield discoveries with infinite possibilities. As the Agency begins the process of replacing the Shuttle with new launch vehicles destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo systems for maximum operational efficiencies. This mandate is imperative to reduce the $4.5 billion NASA spends on space transportation each year. This paper gives top-level details of how the follow-on Crew Launch Vehicle (CLV) is being designed for reduced lifecycle costs as a primary catalyst for the expansion of future frontiers.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Building Operations Efficiencies into NASA's Crew Launch Vehicle Design


    Beteiligte:

    Kongress:

    AIAA Space 2006 ; 2006 ; San Jose, CA, United States


    Erscheinungsdatum :

    2006-01-01


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Building Operations Efficiencies into NASA's Ares I Crew Launch Vehicle Design

    Dumbacher, Daniel L. / Davis, Stephan R. | NTRS | 2007



    AIAA-2006-7280 Building Operations Efficiencies into NASA's Crew Launch Vehicle Design

    Dumbacher, D. / American Institute of Aeronautics and Astronautics | British Library Conference Proceedings | 2006