A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.


    Zugriff

    Zugriff über TIB


    Exportieren, teilen und zitieren



    Titel :

    Return to Flight Resource Reel 2 of 2


    Erscheinungsdatum :

    01.08.2005


    Medientyp :

    Audiovisuelles Material


    Format :

    Keine Angabe


    Sprache :

    Englisch








    REEL DEVICE AND FLIGHT BODY SYSTEM

    KATO FUTOSHI / KOGANEYA TOMOHIKO / TANAKA SHINYA et al. | Europäisches Patentamt | 2019

    Freier Zugriff