Footage of orbiter processing is shown. The Space Shuttle Discovery Landing Operations, Rollback to Orbiter Processing Facility After Landing, Orbiter Processing Facility, Vehicle Assembly Building (VAB), Orbiter Rollover from the Orbiter Processing Facility to the VAB, Atlantis Orbiter Lift and Mate, Atlantis Rollout to Launch Pad 39, Payload Canister Door Opened and Payload Move into Payload Ground Handling Mechanism, Payload into Orbiter, Orbiter Payload Bay Door Closure, Launch Pad Processing at Launch Complex 39, Rotating Service Structure Rollback at Launch Pad, Discovery Lift-off and SRB separation is presented.
Orbiter Processing Overview
2005-01-25
Audiovisuelles Material
Keine Angabe
Englisch
Europa Orbiter Mission Design Overview
NTRS | 2000
|Overview, Low Earth Orbiter Terminal Development
NTRS | 1996
|Lunar Reconnaissance Orbiter (LRO) Navigation Overview
NTRS | 2008
|Lunar Reconnaissance Orbiter (LRO) Navigation Overview
NTIS | 2008
|Mars Reconnaissance Orbiter flight system overview
NTRS | 2001
|