Discovery spent about 15 weeks in the processing facility undergoing about 22 modifications and routine testing. Shown are STS-39 primary payloads installed in Discovery's payload bay in the Orbiter Processing Facility (OPF). Payloads installed in the OPF include the Critical Ionization Velocity payload and the Chemical Release Observatory.
STS-39: Payloads in Cannister at VPF
05.02.1991
Audiovisuelles Material
Keine Angabe
Englisch
IC engine fires on each of cannister piston`s strokes
Kraftfahrwesen | 1985
|AUTOMOTIVE INTERIOR AIR QUALITY CARBON CANNISTER STATUS AND REPLACEMENT/REGENERATION CONTROL
Europäisches Patentamt | 2018
|STS-85: PAYLOADS, PAYLOADS AND MORE PAYLOADS
Online Contents | 1997
|NTRS | 1973
|Wiley | 2012
|