After a brief overview of the operational concept, this paper will provide a detailed description of the _as-flown_ flight software components, the DS1 experiment plan, and experiment results to date. Special emphasis will be given to experiment results and lessons learned since the basic system design has been previously reported. Mission scenarios where beacon operations is highly applicable will be described. Detailed cost savings estimates for a sample science mission will be provided as will cumulative savings that are possible over the next fifteen years of NASA missions.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Flight Validation of On-Demand Operations: The Deep Space One Beacon Monitor Operations Experiment


    Beteiligte:
    Wyatt, Jay (Autor:in) / Sherwood, Rob (Autor:in) / Sue, Miles (Autor:in) / Szijjarto, John (Autor:in)

    Erscheinungsdatum :

    01.01.2000


    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Flight Validation of On-Demand Operations: The Deep Space One Beacon Monitor Operations Experiment

    Wyatt, J. / Sherwood, R. / Sue, M. et al. | British Library Conference Proceedings | 1999



    Beacon Monitor Operations Experiment

    Wyatt, E. / Finley, S. / Hotz, H. et al. | NTRS | 2000


    Beacon Monitor Operations Experiment

    Wyatt, E. / Sherwood, R. / Sue, M. et al. | NTRS | 2000


    Beacon Monitor Operations Experiment

    Wyatt, E. / Sherwood, R. / Sue, M. et al. | NTRS | 2000