This paper describes, in viewgraph form, the faster, better, cheaper approach to space missions. The topics include: 1) What drives "Faster, Better, Cheaper"? 2) Why Space Programs are Costly; 3) Background; 4) Aerospace Project Management (Old Culture); 5) Aerospace Project Management (New Culture); 6) Scope of Analysis Limited to Engineering Management Culture; 7) Qualitative Analysis; 8) Some Basic Principles of the New Culture; 9) Cause and Effect; 10) "New Ways of Doing Business" Survey Results; 11) Quantitative Analysis; 12) Recent Space System Cost Trends; 13) Spacecraft Dry Weight Trend; 14) Complexity Factor Trends; 15) Cost Normalization; 16) Cost Normalization Algorithm; 17) Unnormalized Cost vs. Normalized Cost; and 18) Concluding Observations.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The Faster, Better, Cheaper Approach to Space Missions: An Engineering Management Assessment


    Beteiligte:
    Hamaker, Joe (Autor:in)

    Kongress:

    Space Systems Cost Analysis Group Annual Conference ; 2000 ; Noordwijk, Netherlands


    Erscheinungsdatum :

    2000-01-01


    Medientyp :

    Preprint


    Format :

    Keine Angabe


    Sprache :

    Englisch







    Challenges in the Management of Faster-Better-Cheaper Space Missions

    Pate-Cornell, E. / Dillon, R. / IEEE; Aerospace and Electronics Systems Society | British Library Conference Proceedings | 1998


    Analytical Tools for the Management of Faster-Better Cheaper Space Missions

    Pate-Cornell, E. / Dillon, R. / IEEE; Aerospace and Electronics Systems Society | British Library Conference Proceedings | 1998