Rats were shipped to Kennedy Space Center (KSC), Florida, on day 2 of gestation [(G2) (day 1 = morning on which spermatozoa are present in the vagina)] and laparotomized on G7 to determine the number of implantation sites in each uterine horn. On G8, ten pregnant rats meeting flight criteria (at least five implantation sites each horn) were placed into NASA flight cages (animal enclosure modules, AEMS, five rats per cage), loaded onto the mid-deck of the space shuttle Atlantis, and on G9 (November 3, 1994) they were launched into orbit. On gestation day 20, (November 14, 1994) the shuttle returned to Edwards Air Force Base, California and the flight animals were recovered from the shuttle and subjected to unilateral hysterectomy to provide fetal material from one horn to investigators identified by NASA to study selected fetal parameters. After unilateral hysterectomy, the animals were allowed to recover and deliver vaginally. There were three groups (n = 10 each group) of control animals housed at KSC in the study. A synchronous control group, delayed 24 hours with reference to the flight group, received the same surgeries and was housed five rats per AEM and exposed to all flight conditions (identical temperatures, lighting and humidity) except microgravity. Vivarium control group I did not receive any surgery and was housed in the vivarium in clear polycarbonate cages. Vivarium control group 2 received only a unilateral hysterectomy on day 20 of gestation but otherwise was housed like the vivarium control group 1. Control groups were allowed to complete their pregnancy and deliver fetuses from the remaining horn (Synchronous control and vivarium control group 2) or horns (Vivarium control group 1). After surgery, the dams were euthanized and tissues recovered, and the neonates were assigned to foster dams.
Physiological Anatomical Rodent Experiment (PARE): 04 Flight Support
1997-07-22
Report
Keine Angabe
Englisch