A full-scale turbojet engine was operated with pentaborane fuel continuously for 22 minutes at conditions simulating flight at a Mach number of 0.8 at an altitude of 50,000 feet. This period of operation is approximately three times longer than previously reported operation times. Although the specific fuel consumption was reduced from 1.3 with JP-4 fuel to 0.98 with pentaborane, a 13.2-percent reduction in net thrust was also encountered. A portion of this thrust loss is potentially recoverable with proper design of the engine components. The boron oxide deposition and erosion processes within the engine approached an equilibrium condition after approximately 22 minutes of operation with pentaborane.
Extended Operation of Turbojet Engine with Pentaborane
22.05.1957
Sonstige
Keine Angabe
Englisch